So migraines have me hosed so I turned down the lights and dimmed my monitor and derpped trying to upgrade my build.
It started out simple enough. Lets rip out the TE wall of machines and move AE over there... then maybe get some automation in place.
AE Upgrades by
Saice, on Flickr
Yeah that how all projects start... this is be easy. Not so much.
because I know these things have a tendency to expand I figured we should start out with a decent size. 9x7x6
AE Upgrades by
Saice, on Flickr
AE Upgrades by
Saice, on Flickr
Then came the problem of making all the heat vents.
AE Upgrades by
Saice, on Flickr
Then 20 Crafting CPUs because I'll never be fully automated as I'm not a fan of that but 21 crafting steps every 3 ticks will be more then I should ever need.
AE Upgrades by
Saice, on Flickr
Then I had to make a lot of processors for the pattern system. There is 120 spaces left in the ME Crafting cube of death so I might as well fill that up now.
AE Upgrades by
Saice, on Flickr
Button it up and there it is.
AE Upgrades by
Saice, on Flickr
AE Upgrades by
Saice, on Flickr
A little more dicking around with the engineering room and a set of switches and pressure plate so I can toggle the system on and off and turn off the crafting system when I don't need it and I'm good.
AE Upgrades by
Saice, on Flickr
Later I'll work on the processing automation.