Any instructions for making the jump drive? Sounds cool.
It's basically a frame motor connected to a 9 blocks long frame with power line above and redstone below. When the redstone pulses the frame moves nine blocks. When the frame motor reaches its final position, it is recycled around the back on a conveyer belt of frame motors.[DOUBLEPOST=1361405804][/DOUBLEPOST]
Nice video, I liked the section on your state cells worked. I think i could remove my latch system and use state cells on my rig.
I might have missed it in the video -- i jumped around to mostly see the logic sections. Did you mention how you detect when the quarry is done?
I like state cells too they can replace most simple programs and are more fun to watch than a computer. I have a structure pipe with a gate set to work done to detect when the quarry is done. I wanted to use work scheduled but that is bugged, so I use NOT work done. If all quarries are finished, the line goes low and the frame moves. However there is another bug when you use gates on a frame. They don't update until you force a block update.