So after posting the specs of my power station in What does YOUR Power Room look like?, I've realized Im wasting quite a bit of steam per tick, and am looking to upgrade from HV PowerConverters' producers per two boilers to EV producers per every 6.
As far as I've been able to manage, I haven't been able to supply enough steam via liquiducts to the PC's steam consumers to output a steady 2048EU/t even though 6 36HP boilers produce enough steam for such:
720mB steam * 6 = 4320mB steam per tick
4320mB steam * 875 steam conversion units / 1800 EU conversion units = 2100EU/tick
So my question: is there a setup for boilers+PC's to convert steam to EV-EU?
As far as I've been able to manage, I haven't been able to supply enough steam via liquiducts to the PC's steam consumers to output a steady 2048EU/t even though 6 36HP boilers produce enough steam for such:
720mB steam * 6 = 4320mB steam per tick
4320mB steam * 875 steam conversion units / 1800 EU conversion units = 2100EU/tick
So my question: is there a setup for boilers+PC's to convert steam to EV-EU?
The 8 boilers that do not have liquiducts attached to them are the boilers Im trying to convert to EV-EU:
Last edited: