I have been playing around with RFTools dimension for the last two days, using FTB Infinity 10.1, and one thing I have noticed is that Dimlet costs does not correctly account for the final Dimension cost.
For example, I have a "BioFuel Dimlet". Maintain Cost: 3000 RF/tick, and Tick cost: 300 ticks.
I add this in front of a Terrain Dimlet with a Maintain cost of 1 RF/tick and Tick cost of 1 tick.
Final Dimension cost:
Maintenance cost: 15011 RF/tick
Tick Cost: 702 ticks
This does not add up at all. Is there something I'm overlooking?
The cost of a random Dimension is like 300 RF/tick, so even if I have to account for the unspecified Dimlets, there are still 12000 RF/tick that is unaccounted for.
Is there something I can do to get the cost down?(Other than Efficiency Dimlet)
For example, I have a "BioFuel Dimlet". Maintain Cost: 3000 RF/tick, and Tick cost: 300 ticks.
I add this in front of a Terrain Dimlet with a Maintain cost of 1 RF/tick and Tick cost of 1 tick.
Final Dimension cost:
Maintenance cost: 15011 RF/tick
Tick Cost: 702 ticks
This does not add up at all. Is there something I'm overlooking?
The cost of a random Dimension is like 300 RF/tick, so even if I have to account for the unspecified Dimlets, there are still 12000 RF/tick that is unaccounted for.
Is there something I can do to get the cost down?(Other than Efficiency Dimlet)