I've come to the conclusion that MFR Steam Boilers are pretty badass. It takes 7 to power a full scale BR Turbine (I'm using 8 because I'd rather have more steam than not enough), and they are actually more fuel efficient than a RC HP Boiler. Come to think of it, that might not actually be true once the RC Boiler is up to temp, but I didn't have 5 hours and an excess assload of fuel to get it there to test. The MFR Steam Boilers also have a heat up period, but its not long. Once running, they were actually stuttering while I found a way to get water pumped to them faster than they could use it.
I'm currently feeding blaze rods to the MFR Steam Boilers, but I've devised a system with a Fluid Transposer and 2 MFR Lava Fabricators (might not actually need 2, but I had them, so...) to fill buckets of lava for fuel. Since a bucket burns for a good while in the boilers (and they can hold 4 each in queue), there is more than enough time to fill the buckets and restock the boilers. The net gain off the turbine is substantial. Next is to build a new turbine so I can stress test this fuel delivery system and see how it keeps up.