I have 2 ultimate hybrid solar panels going into a aesu, and I have 2 turbines going into the same aesu. The aesu is set to output 512 and input 2018. The mass fab is taking around 512 eu/t and the panels aren't imputing 1024 like they shud but instead around 411 cuz the turbines are running at 100% . Is there anyway to only let the turbines run at night when I'm losin power?