1)
1) Extra parallelization on your current machines. Running the full set of bee machines takes up 300 MJ/t. If you make copies so you can do multiple inoculations at once, then that can get up to 600, 900 or even 1200 if you are doing 4 at the same time.
You don't really need 1200MJ production for this, you just need a large enough buffer of redstone energy cells. Think I have 8 energy cells buffering my bee machines.