I've been doing some testing, messing with a boiler on my test world and I found out that, at least on 1.5.2, tesseracts have an input limit of 100mB/t per side. Meaning that a liquid tesseract has a limit of 600mB/t total for input, they still have no apparent limit for output.
To max out a a HP36 steam boiler using tesseracts, it takes 2 tesseracts taking the steam input with 9 liquiducts attached to the boiler with 480 mB from the second tesseract to spare. If you have 2 boilers it takes 3 sending tesseracts to max it.
1 Boiler = 720 mB/t, 1 Tesseract = 600 mB/t, 2 Tesseracts = 1200 mB/t
2 Boilers = 1440 mB/t, 2 Tesseracts = 1200 mB/t, 3 Tesseracts = 1800 mB/t
3 Boilers = 2160 mB/t, 3 Tesseracts = 1800 mB/t, 4 Tesseracts = 2400 mB/t
4 Boilers = 2880 mB/t, 4 Tesseracts = 2400 mB/t, 5 Tesseracts = 3000 mB/t
5 Boilers = 3600 mB/t, 6 Tesseracts = 3600 mB/t
Because of these limits, I've found that the best setup for boilers is in groups of 5, if you plan on transporting the steam with tesseracts. This is the design I came up with
With the steam being converted into EU with power converters (as a side effect, it also made it much easier to figure out where the limiter was). 5 Steam boilers running this setup, if you can provide the fuel, provides 1700 EU/t and no steam is wasted, it uses the full 3600 produced steam. I'm fairly sure the tesseract nerf was pretty recent
If you're wondering, the numbers are fluctuating because of the way I have the receiving tesseracts set up, I was just trying to ensure there was no bottleneck I was not seeing
To max out a a HP36 steam boiler using tesseracts, it takes 2 tesseracts taking the steam input with 9 liquiducts attached to the boiler with 480 mB from the second tesseract to spare. If you have 2 boilers it takes 3 sending tesseracts to max it.
1 Boiler = 720 mB/t, 1 Tesseract = 600 mB/t, 2 Tesseracts = 1200 mB/t
2 Boilers = 1440 mB/t, 2 Tesseracts = 1200 mB/t, 3 Tesseracts = 1800 mB/t
3 Boilers = 2160 mB/t, 3 Tesseracts = 1800 mB/t, 4 Tesseracts = 2400 mB/t
4 Boilers = 2880 mB/t, 4 Tesseracts = 2400 mB/t, 5 Tesseracts = 3000 mB/t
5 Boilers = 3600 mB/t, 6 Tesseracts = 3600 mB/t
Because of these limits, I've found that the best setup for boilers is in groups of 5, if you plan on transporting the steam with tesseracts. This is the design I came up with
With the steam being converted into EU with power converters (as a side effect, it also made it much easier to figure out where the limiter was). 5 Steam boilers running this setup, if you can provide the fuel, provides 1700 EU/t and no steam is wasted, it uses the full 3600 produced steam. I'm fairly sure the tesseract nerf was pretty recent
If you're wondering, the numbers are fluctuating because of the way I have the receiving tesseracts set up, I was just trying to ensure there was no bottleneck I was not seeing