So the HQM quest "better-Than-Iron-Man" says that IC2's blast furnace, once set up is faster than Immersive engineering's blast furnace (testing against the crude one without any pre-heaters), but i've not found this to be the case. I've got a heat generator with 10 coils, outputting 100HU into the IC2 blast furnace (and it's electric buffer icon is full, so it is outputting max hU), with a dedicated compressor for cycling air canisters and using extra-util transfer system for pulling/inserting items into a locked 4x4 storage drawer with spots for the refined iron, slag, and empty air canister. filtered transfer node out for pulling those empty air canisters and throwing them back into the compressor, which then puts them back into the blast furnace...
Anyways, in testing, with 10 coils, my immersive engineering crude furnace still performs almost 3 times faster than the IC2 one. what's the deal?
Anyways, in testing, with 10 coils, my immersive engineering crude furnace still performs almost 3 times faster than the IC2 one. what's the deal?