X
Xx_Yasuchika_xX
Guest
Summary of the problem Fluix Conduits not stacking
Pack Version 1.1.0
What is the bug? I'm messing with Applied Energistics 2 trying to get a system going, and I have two stacks of glass fluix pipes that should go together, but they stay in a stack of 29 and a stack of 39. When they are all placed on the ground and broken, they still come up as the two stacks of 29 and 39
Mod & Version Applied Energistics 2 rv4 alpha11
Link to log file
Is it repeatable?
Known Fix
Pack Version 1.1.0
What is the bug? I'm messing with Applied Energistics 2 trying to get a system going, and I have two stacks of glass fluix pipes that should go together, but they stay in a stack of 29 and a stack of 39. When they are all placed on the ground and broken, they still come up as the two stacks of 29 and 39
Mod & Version Applied Energistics 2 rv4 alpha11
Link to log file
Is it repeatable?
Known Fix