You should only need 1 export bus if you use a fuzzy or precision one.Well I multimeter'd them, and it said energy request as 0. I am not totally sure what this means. EU is just so much more easy to manage/tweek in terms of system.
The main problem with shut-off via redstone signal, is that (for fermenter)....
2 input AE export, 1 for fertilizer, 1 for saplings
1 input power
1 input water/juice
1 output
I wish conductive piping didn't suck dick.
If you are talking about Conductive pipes, then those have been scrapped some time ago. Admittedly, Kinesis pipes probably looks like the old pipes, but they don't suck that much dick any more. You might of course still not be happy, but we can't please everyone.I wish conductive piping didn't suck dick.
Hmm, might have been changed, though experience tells me different (I'll explain why)....You should only need 1 export bus if you use a fuzzy or precision one.
If you are talking about Conductive pipes, then those have been scrapped some time ago. Admittedly, Kinesis pipes probably looks like the old pipes, but they don't suck that much dick any more. You might of course still not be happy, but we can't please everyone.